PCS MP(RT) 001 Project Monitoring & Performance Report_v1.0
Document Control
Document code: PCS-MP(RT)-001
Title: Project Monitoring & Performance Report (Regular Track)
Scope: Template for reporting monitored performance and quantified GHG results for each monitoring period for Regular Track projects, including QA/QC, safeguards summary, and deviations/corrective actions.
Outcome: Standardizes monitoring disclosures and supports verification and issuance readiness.
Version history and change log
Table DC-1. Revision history
v1.0
TBD
Draft
Release for public consultation
PCS
TBD
Superseded versions
No superseded versions for v1.0.
Purpose
This Project Monitoring Report (PMR) template shall be used by Project Developers for reporting project performance and GHG emission reductions achieved during each monitoring period under the Planetary Carbon Standard (PCS).
Section A – Project Identification and Reporting Period
Project Title
Project Category / Track
☑ Regular (Type A/B) ☐ NBS (Type C) ☐ Other: ___________
Host Country
Sectoral Scope(s)
Monitoring Period Start Date (DD/MM/YYYY)
Monitoring Period End Date (DD/MM/YYYY)
Version No. of Report
Section B – Monitoring Summary
Provide a concise summary of the monitoring period, key project activities implemented, and any operational updates. Include changes in project conditions, stakeholders, or environmental factors influencing performance.
Operational or Environmental Changes
Project Equipment / System Maintenance
Key Observations and Challenges
Section C – GHG Monitoring Data and Parameters
Provide monitored data for relevant parameters as per the approved methodology and monitoring plan. Include raw data summaries, sampling frequencies, and units of measurement.
Section D – Calculation of Emission Reductions
Provide calculations for baseline emissions, project emissions, leakage, and net GHG emission reductions for the monitoring period. Include key equations and assumptions as per the methodology.
Project Emissions (tCO₂e)
Leakage (tCO₂e)
Net Emission Reductions (tCO₂e)
Calculation Methods / References
Uncertainty Assessment / Confidence Level
Section E – Quality Assurance / Quality Control (QA/QC) and Data Management
Describe QA/QC measures applied to ensure data integrity, accuracy, and completeness. Include calibration records, data validation processes, and any third-party oversight.
Calibration and Maintenance Records
Data Management and Storage Method
Verification Cross-checks (if any)
Section F – Environmental and Social Safeguards Summary
Provide a summary of environmental and social performance during the monitoring period, including updates from the PCS Environmental & Social Safeguards and SDG Impact Assessment Forms.
Key SDG Impacts Observed
Corrective Actions (if any)
Section G – Corrective Actions and Deviations (if any)
Describe any corrective actions, non-conformities, or deviations encountered during the monitoring period. Attach corresponding PCS Post-Registration Change Request or Deviation Request forms if applicable.
Date of Occurrence
Corrective Action Taken
Linked PCS Reference (PRC / Deviation Form ID)
Section H – Project Developer Declaration
By signing below, the Project Developer confirms that this report accurately reflects the project’s performance during the monitoring period, that all data is supported by verifiable records, and that the project remains in compliance with PCS Framework requirements.
Organization
Digital Signature / Authorization Token
Date (DD/MM/YYYY)