PCS LOA Letter of Authorization (Regular)_v1.0
Document Control
Document code: PCS-LOA
Title: Letter of Authorization (Regular)
Scope: Template to authorize project registration and participation under PCS, confirm legal authority and rights, and support registry publication and verification.
Outcome: Provides a standardized, auditable authorization instrument supporting ownership, authorization scope, and integrity controls.
Version history and change log
Table DC-1. Revision history
v1.0
TBD
Draft
Release for public consultation
PCS
TBD
Superseded versions
No superseded versions for v1.0.
Governance note on versioning and archiving
Only the latest approved version of this template shall be used. Superseded versions shall be archived and retained for traceability and audit purposes. Printed or downloaded copies are uncontrolled; the PCS published version is the authoritative current version.
Purpose and Applicability
This Letter of Authorization (LOA) template is used to formally authorize the registration, validation, and participation of a project under the Planetary Carbon Standard (PCS). It serves as a universal document applicable across all PCS project categories and tracks. The LOA confirms the legal rights of the undersigned entity(ies) to develop, manage, and register the project, and to receive the corresponding Planetary Carbon Units (PCUs) generated from the project.
Section A – Project Identification
Project Title
Host Country
Project Category
☑ Regular ☐ NBS ☐ Other: ___________
Applicable Methodology
Sectoral Scope(s)
Section B – Parties to Authorization
Identify the legal entity(ies) involved in this authorization, including the Project Owner(s), Developer(s), and any Authorized Representative(s). Each entity listed below must have the legal authority to sign and represent the project.
Section C – Authorization Scope
Define the scope and nature of the authorization. This includes whether the authorization is exclusive or non-exclusive, and what specific activities it covers under the PCS framework.
Authorization Purpose
☑ Project Development ☑ Validation ☑ Registration ☑ Issuance ☐ Other: ___________
Effective Date (DD/MM/YYYY)
Validity Period / Expiry Date
Reference to Legal Agreement or MOU (if applicable)
Section D – Legal Declarations
Section E – Digital Signature and Verification
This section must be completed by the authorized representative(s) of the Project Owner(s) or Host Country Designated Authority. Each signature will be verified and timestamped within the PCS Blockchain Registry.
Organization / Entity
Digital Signature / Authorization Token
Date (DD/MM/YYYY)
Section F – Revision History
v1.0
01/06/2025
Initial PCS Release
PCS Regulatory Council